Srpska verzija

News

13.05.2010.
Ecological actions of "Drina Lakes" organization and "Hydroelectric Power Plants on Drina river"sc Visegrad company
Ecological activity of "Drina Lakes" organization and "Hydroelectric Power Plants on Drina river"sc Visegrad company
More than a hundred members of ecological-fishing association "Drina Lakes" from Visegrad participated together with employees of "Hydroelectric Power Plants on Drina river" sc Visegrad in ecological cleaning action on fishing path from  "Visegrad" dam to Mehmed-Pasha Sokolovic bridge...
The river Drina
Detaljnije >> >> >>
29.04.2010.
Plan of electricity generation for April is completed
Up to 29 April electricity generation is 125.096.000 kWh or 36% above plan for 2010 due to rainfall and corresponding operational readiness...
Detaljnije >> >> >>
19.04.2010.
Plan of electricity generation for March is completed
Up to 25 March electricity generation is 121.080.000 kWh or 25% above plan for 2010 due to unusually heavy rainfall and the corresponding operational readiness

 


Detaljnije >> >> >>
01.04.2010.
Invitation for twenty fifth Audit Board meeting
On the basis of Article 11 of the Rules of the Audit Board "Hydroelectric Power Plants on Drina river" sc Visegrad, I schedule...
Detaljnije >> >> >>
01.04.2010.
Invitation for forty second Supervisory Board meeting
On the basis of Article 15 of the Rules of Procedure of the Superior Council of "Hydroelectric Power Plants on Drina river"sc Visegrad,  I schedule...
Detaljnije >> >> >>

<< Prethodna 1 2 3 4 Sljedeća >>

 

The river Drina

The Bridge on the Drina