"HPPs ON DRINA RIVER" ViĊĦegrad
HYDROELECTRIC POWER PLANT VISEGRAD
News
19.11.2010.
Environmental protection in "HPPs on Drina river"sc VisegradHPP
"Visegrad" pays special attention to protection and improvement of
environment. Environmental quality is constantly monitored by a number
of activities. There are, preparation of individual programs of air
quality control, water quality, soil pollution, noise level measurement
as well as undertaking a series of measures to reduce emissions from
plant and influence of accumulation, which are performed every year...
19.11.2010.
Results notice of competition for preliminary architectural design for "HPPs on Drina river"s.c. Visegrad office buildingCompetition for preliminary architectural design for "HPPs on Drina river" s.c. Visegrad office building, which construction is planned within Protection Zone I of Mehmed Pasha Sokolovic Bridge, was published on 24 May 2010 is completed fully...
15.10.2010.
Sale of electricity with an analysis of sales prices for January-September 2010
In September 2010, "HPPs on Drina river" produced 25,522,394 kWh of electricity and according to it revenue of 728,555 BAM ...
11.10.2010.
Financial statements - Deloitte
Statement of comprehensive income year ended December 31, 2009 (in BAM) ...
06.10.2010.
Indipendent report of AuditorsTo the Advisory Boar the Shareholders and Supervisory Board of Hidroelektrane na Drini a.d., Višegrad, a Subsidiary of the Mixed Holding Power Utility of the Republic of Srpska, Trebinje (Continued)...
<< Prethodna 1 2 3 4 5 Sljedeća >>

